Client Cases

Client Cases & Industry Scenarios

What an engagement looks like from your side of the table: the situation, the verification on site, the record, and the deliverables that stay with you.

About these cases

What is published on this page are industry scenario examples: typical situations described from the buyer's side, together with the verification actions and deliverables that apply to them. They are not presented as named client references. When a client authorises publication, that project's own record replaces the corresponding scenario — with the client's written consent and commercially sensitive details removed. We do not dress a scenario up as a client reference.

How a case is recorded

Every case follows the same four-part structure

So you can compare them, and so you can see exactly what is evidenced and what is simply described.

01The situation

What the buyer was facing, described from their side and de-identified.

02Verification on site

What we actually did at the plant — entity, lines, records, sampling or loading.

03The record

What was photographed and written down, item by item, with fact labels attached.

04The deliverables

What you receive, and what stays retrievable from archive afterwards.

Industry scenarios

Six situations buyers sourcing from China recognise

Ordered the way a project actually runs — from a new supplier before the first order, through production and shipment, to what happens after the goods arrive.

Production line at a robotic mower factory during an on-site verification (scenario example)
Robotic mowersBefore the first order

A new supplier, before the first order

The situationA buyer is about to place a first order with a factory found online. What they hold is a business-licence scan and a handful of workshop photos.

What we verified on siteWe attended the plant and checked the business-licence entity against the premises actually visited, walked the production lines, and compared work-in-progress orders with the capacity the factory states.

What went on the recordEach item photographed and numbered, with the entity and site facts written down as found — no scores, no verdict.

What was deliveredOn-site photographs, the checklist with fact annotations, the open-items list and a written recommendation.

What you can judge from itWhether the entity you would sign with is the entity running those lines — and whether this factory belongs on your supplier list.

Drone component assembly line during a repeat on-site supplier verification (scenario example)
Drone componentsRepeat supplier check

An existing supplier, two years in

The situationA buyer has worked with the same supplier for two years. The products are fine, but they have never seen the plant — and the people they dealt with have changed.

What we verified on siteA repeat verification across the same areas as a first audit: entity and premises, lines and equipment, quality system, shop-floor records and the capacity actually in place.

What went on the recordCurrent facts as found, alongside what the earlier record showed, so change over time is visible.

What was deliveredA fresh checklist with new numbering, photographs of what is there now, and any open items with corrective deadlines.

What you can judge from itWhether the supplier is still the one you approved — and where, if anywhere, it has drifted.

Smart home device production line with sealed-sample comparison on the bench (scenario example)
Smart home devicesSample to bulk

Sample approved — will bulk production match?

The situationThe sample passed everything the buyer tested. The risk is not the sample — it is what happens on the line once the order gets large.

What we verified on siteSealed-sample benchmarking first, then sampling against the sealed reference while the goods are still in production.

What went on the recordWhat was sampled, when, and against which reference — with photographs at each stage.

What was deliveredThe sealed-sample record, in-production sampling results and photographed evidence.

What you can judge from itWhether the bulk run is being made to the same reference you approved.

Shop-floor walkthrough and equipment check at a 3D printer factory (scenario example)
3D printersIn production

The order is placed — who is watching the line?

The situationProduction has started. The buyer is thousands of kilometres away and cannot visit; the only schedule updates come from the factory itself.

What we verified on siteScheduled patrols at agreed milestones, checking which line is running the order and how the schedule compares with the plan.

What went on the recordMilestone dates, what was on the line at each visit, and any deviation with its corrective deadline.

What was deliveredMilestone reports with photographs and a written note on any schedule or specification deviation.

What you can judge from itWhether the delivery date still holds — while there is still time to act on it.

Pre-shipment AQL sampling of finished cartons at a factory (scenario example)
AI toysBefore shipment

Before the container leaves

The situationThe goods are finished and a shipping date is booked. The buyer needs to know whether the cartons about to leave match what was ordered.

What we verified on siteIndependent AQL sampling on the finished batch, packing and carton-marking checks, and loading supervision as the container is filled.

What went on the recordSample size, defects found by class, and photographs of both the batch and the loaded container.

What was deliveredAn inspection report with photographic evidence, issued before the goods depart.

What you can judge from itWhether to release the shipment — and what to raise with the factory while the goods are still at the plant.

Delivered batch and logistics records reviewed against the approved reference (scenario example)
Cross-categoryAfter arrival

The goods have arrived and something is different

The situationThe order has reached its destination and the buyer has found deviations against the agreed specification.

What we looked atThe record built during the project: the sealed sample, the sampling results, the milestone reports and the contract clauses on quality and remedy.

What was on the recordThe documented chain from the approved reference to the delivered batch, item by item.

What was deliveredThe original records retrieved from archive, plus a written note on where the documented trail sits.

What you can judge from itWhat the evidence supports — so the conversation with the factory starts from documents rather than goodwill.

These are scenario examples for orientation, not client endorsements. Real project records replace them as clients authorise publication.

Tell us which of these sounds like your project. We will set out the verification scope and the deliverables in writing before anything starts.

Talk to us about your project
Also worth reading

Where the standard behind these cases is published

Case FAQ

Questions about our cases

What buyers ask when they read a case page like this one.

Are these real client cases?

The records published now are industry scenario examples, described from the buyer's side — we do not present a scenario as a named client reference. When a client authorises publication, that project's own record replaces the scenario, with the client's written consent and commercially sensitive details removed.

Do you have a completed project in my category?

We will tell you plainly whether we have a comparable project we are permitted to describe. If we do not, we say so, and instead walk you through the checklist and a sample report — the same scope you would approve for your own project.

Will my project be published as a case?

Only with your written consent. Projects are covered by confidentiality, and a case is published only if you approve it and after commercially sensitive details have been removed.

What can I check myself rather than taking a case at face value?

Every report carries a unique number you can verify on this website, and our checklist, fact-annotation labels and evidence rules are published in full. You can read the standard before you commission anything.

Does a scenario example mean the outcome is guaranteed?

No. A scenario describes the verification actions and the deliverables that come with them — not a promised result. What is found on your project is what the on-site record shows, and the decision stays with you.

Key factsThe case library records risk scenarios and industry practice examples. Each entry sets out the situation, the on-site check, how it was recorded and what was delivered, and is labelled as an illustrative scenario rather than a client endorsement. No client names or specific operating figures appear.

Start with the situation you recognise.

Tell us which of these sounds like your project. We will set out the verification scope and the deliverables in writing before anything starts.

Talk to us about your project
Book an
Independent Audit
Supply-chain risk control
Pre-Audit +
Managed Sourcing