Our method, open end to end.

Rather than relying on brand reputation, we publish our full checklist, process and report framework. All records are traceable and re-verifiable; a conclusion that cannot be verified has no credibility. VerdiFlux records facts only — we do not trade audit conclusions, and we do not recommend or vouch for any factory.

← Back to all solutions

Four boundaries — protection for both the buyer and the factory

×

No surprise visits. The schedule, scope and checklist reach the factory days in advance. For you: what you see is the factory's real daily state, not a staged show. For the factory: a prepared collaboration, not a hostile raid.

×

No pass/fail verdict. We label no one qualified or disqualified. You judge on the evidence; the factory is not sentenced for life by a third-party score — both sides are treated by facts, not grades.

×

No speaking for either side. We sign nothing on the factory's behalf and take no position without on-site evidence. The factory's own words go into the report verbatim — you hear both sides, and the factory need not fear being misquoted.

×

No conclusion for sale. Once issued, the report never changes for any business relationship. A good factory cannot be smeared by a paying competitor, and the conclusion you receive carries zero hidden interest — integrity here pays both ways.

Convinced by the boundaries? Let's put them to the test on a real factory.

Book an independent audit

What you receive — a verifiable, traceable record of facts

Every project ends in one document that answers your questions before you ask them. Laid out item by item, so it can be scanned at a glance and acted on with confidence.

1. What we verify — six areas

Every project runs on a standardised checklist covering the six areas below. On top of that, you can define your own specific checks: the risks you care about are exactly what we verify on site. The lists below show everything we check in person.

Entity & credentials

Entity & credentials

  • Business licence, actual operating address and factory-gate signage checked for consistency
  • Business scope, legal representative and shareholders cross-verified against public company records
  • Years in operation, plus any abnormal-operation or public regulatory listing on record
  • Whether the signing entity is the one that actually runs the workshop — entity, site and production lines checked for consistency
Lines & equipment

Lines & equipment

  • The equipment list checked item by item against what stands on the shop floor
  • Maintenance and metrological calibration records for key quality equipment
  • Production takt time and bottleneck points at every key process
  • Automation level assessed, with the real output it can support — measured against claimed capacity
Quality system

Quality system

  • Inspection records at the three gates: incoming (IQC), in-process (IPQC) and outgoing (OQC)
  • Actual defect-rate data: live process records versus reconstructed paperwork
  • Valid calibration certificates for measuring instruments
  • Sealed-sample management, and the rules for judging bulk goods against the seal
  • Closed-loop customer-complaint handling records
Shop-floor management

Shop-floor management

  • 5S and housekeeping recorded as found on the day — last-minute tidying is not accepted
  • Compliance status of safety exits, firefighting equipment and electrical wiring
  • Work-in-progress and material identification, with zoning control
  • Warehouse layout, material turnover and storage discipline
Capacity claims

Capacity claims

  • Claimed capacity cross-checked as equipment count × measured takt time
  • Shift pattern and the real headcount on the shop floor
  • Peak-season plan: overtime, extra shifts, or subcontracting
  • Proportion of work subcontracted out, plus subcontractor information
Delivery & packing

Delivery & packing

  • Packing method and materials checked against your order requirements
  • Carton marking and shipping marks verified against specification
  • Loading plan and container space utilisation
  • History of delivery delays, and the factory's attitude to correcting them

2. Ten steps, same order, every time

The entire process is standardised and fixed, regardless of project size. The design intent: you see project progress in real time and know the exact state of every node.

Factory pre-screen01

Factory pre-screen

Basic documents, capacity and entity credentials checked in advance; unqualified factories filtered out.

Scheduling02

Scheduling

Date, scope and checklist confirmed and sent to the factory in advance — no surprise visits.

Document review03

Document review

System documents and quality records reviewed for real, effective implementation.

On-site verification04

On-site verification

Lines, equipment and warehouse surveyed in person, with photos and video archived.

Interviews05

Interviews

Owner, production and quality staff interviewed to cross-check how work is really done.

Findings log06

Findings log

Non-conformities and risks logged on site into a live finding list.

Draft confirmation07

Draft confirmation

Draft checked against the facts with the factory — data traceable, wording neutral.

Corrective follow-up08

Corrective follow-up

Corrective requirement, deadline and re-check standard set for each item.

Report delivery09

Report delivery

Full report, photo archive and risk list delivered as your decision basis.

Ongoing support10

Ongoing support

Follow-up re-verification arranged as needed, keeping supply-chain risk under control.

3. How we judge — verifiable facts, comparable data

We do not issue subjective scores. A single score cannot judge a factory's trustworthiness — it only invites more questions: would a score really tell you what you need to know?
What we deliver is hard decision data: every check item is labelled with one of three objective states below, so multiple factories can be compared side by side on the same terms; every label comes with archived evidence, available on request. Build your sourcing decision on verifiable, traceable facts:

VerifiedVerified

Observed on site or read in the documents, with the evidence recorded and filed.

On what basis

  • Seen in person: equipment, lines and records checked on site
  • Image archive: on-site photos and videos filed with time and location data
  • Document check: cross-verified against originals or official public records
Open questionOpen question

Could not be confirmed within the scope of this visit; recorded as an open question, never filled in with an assumption.

On what basis

  • Conflicting evidence: what we saw differs from the factory's account
  • Authenticity not confirmable on the spot: documents or data pending third-party confirmation
  • Verbal statement only: no physical or documentary support, not accepted as fact
Not yet verifiedNot yet verified

The item could not be verified as at the audit date, with the factory's own explanation attached.

On what basis

  • Outside the scope commissioned for this engagement
  • Site constraints: area closed, equipment idle or inaccessible
  • Time or schedule limits — not covered this visit

Every label is tied to a piece of evidence. You may ask for the raw photograph or document behind any single line.

4. Ways you can verify us

FAQ

Common questions about the method

What buyers ask most often after reading the whole method.

Can the checklist be customised?

The six core areas are always covered as mandatory items. On top of that, you can add specific checks for the exact risks you care about — your risk points are what we verify on site.

Can the buyer observe the audit remotely?

Yes. During the on-site stage you can join a live video call and watch the whole verification in real time — the method is public, and so is the execution.

What does "Open question" mean in the report?

It means the on-site evidence was not enough to confirm the item either way. We never fill the gap with a guess and never issue a pass/fail verdict — we label it an open question so you can weigh the risk yourself.

Can I request a re-check after the report is issued?

Yes. You may commission a re-verification of any open or questioned item; we re-check and supplement the supporting evidence. Re-verification is a separate paid service, quoted by scope and confirmed in writing before it starts.

How is this different from SGS, BV or Intertek?

Those are large conformity-assessment bodies: they serve many industries, work to published standards, and are usually engaged to certify or test a product. We are a China-focused sourcing partner that works for the buyer: we verify the factory behind your order on site before you sign, and then manage the order through production and shipment. If you need a certificate for market access, a certification body is the right tool. If you need to know whether this factory can actually make your order and keep its promises, that is what we do — and our findings are recorded as facts for your decision, not converted into a grade.

Key factsOur method is open end to end: the checklist is shared with the factory in advance, each point is photographed on site, and conclusions map to evidence one by one. Labels distinguish verified, not verified and open question, so nothing unverified is stated as fact. Every report carries a unique number that can be verified online.

See the method? Then test it.

Commission an audit, or book a video pre-check and watch how we work before you commit.

Start an audit enquiry