Scenario exampleInflated capacity claims
What happensA supplier claims 50,000 units a month. The line can actually make 12,000.
What we doOn-site verification of equipment, shifts and work-in-progress against the claimed output.
OutcomeThe gap is found before the order, not after the deadline.
Scenario exampleBorrowed certifications
What happensA copy of someone else’s certificate is presented as this factory’s own.
What we doCertificate holder, address and scope are checked against the plant actually visited.
OutcomeThe certificate holder, address and scope are compared with the plant actually visited, and the difference is put on record.
Scenario exampleSample passes, mass production does not
What happensThe sample uses imported material; the bulk run quietly switches to a cheaper grade.
What we doSealed-sample benchmarking plus in-production sampling against the sealed reference.
OutcomeThe substitution is stopped while the goods are still on the line.
Scenario exampleSilent subcontracting
What happensThe factory you signed with passes the order to a small workshop you never approved.
What we doResident and scheduled patrols verify which line is running your order and whose name is on it.
OutcomeSubcontracting surfaces early enough to be reversed.
Scenario examplePayment and term exposure
What happensA deposit is paid, then the price moves, or the delivery date drifts.
What we doContract risk clauses, milestone records and staged-payment recommendations.
OutcomeYou negotiate with evidence instead of goodwill.
Scenario exampleInspection in name only
What happensThe factory’s own report says everything passed. Nothing was actually sampled.
What we doIndependent AQL sampling with photographic and written records.
OutcomeDecisions rest on data, not on a stamp.
Note: the cards above are industry scenario examples illustrating our method — not real client projects. Real client cases, fully redacted and reviewed, will be added to this library in due course.